Third Israeli Vessel Completed in Germany Under Reparations Pact
Menu JTA Search

Third Israeli Vessel Completed in Germany Under Reparations Pact

Download PDF for this date

A modern 3,128-ton freighter with a speed capability of better than 14 knots slid down the ways at the Orenstein and Koppel shipyards here today, after she received the name, “Kedmah,” from Dr. Gertrud Luckner, a German Catholic woman who is one of Germany’s most valiant fighters for Jewish rights.

A sistership of the recently constructed “Galila,” the “Kedmah” is 325 feet long, 47 feet wide, and is powered by two 1,470 horsepower engines. Ordered by Zim-Shoham lines, she is the third and last vessel to be built under terms of the Geman-Israel reparations agreement at this shipyard, which was originally founded in pre-Nazi days by two Jews, who gave the yard its name. They were forced to sell out under the Hitler regime and are no longer connected with the firm.

Founding Funders

The digitization of the JTA Archive would not have been possible without the generous support of the following donors:
  • The Gottesman Fund
  • Righteous Persons Foundation
  • Charles H. Revson Foundation
  • Elisa Spungen Bildner and Robert Bildner, in honor of Norma Spungen
  • George S. Blumenthal
  • Grace and Scott Offen Charitable Fund