The work of laying a 144-mile long pipeline to carry oil from Elath to Beersheba was begun today. The oil line, to be constructed entirely from locally-produced steel pipe, is expected to take four months to complete.
The Archive of the Jewish Telegraphic Agency includes articles published from 1923 to 2008. Archive stories reflect the journalistic standards and practices of the time they were published.